From: route@monster.com
Sent: Saturday, April 16, 2016 2:05 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Clarence Gomez Cell # 407-288-3283
/ Email address: ctzgomez2002@yahoo.com Qualifications
Profile Multifaceted
Wireless Network Engineer with experience within diverse wireless telecom
product and support. Proven ability to plan, coordinate and execute
successful full life cycle Wireless Network, engineering, development and
testing projects. In-depth knowledge of Wireless Network engineering
technologies and design techniques, with the ability to apply them to achieve
key technical and operational objectives. Adept at clearly establishing
priorities and driving the timely completion of complex task..Outstanding
ability to gather and translate complex client requirements into practical,
reliable, cost-effective system solutions. Proactive problem solver,
implementing engineering solutions with careful consideration to the bottom line,
long-range goals, quality, feasibility and ease of use. Professional
Experiences: 9/2003 to present MYCOM North America, Inc.
Nokia Flexi BTS Integrator – 10/2014 to
present TMobile Miami Market · Perform
Commissioning ,Integration and troubleshooting of Nokia Flexi BTS Equipment · Perform Installation
and Commissioning of Alcatel 7705 Router . Sr. Field Engineer-DAS(6/2011 to 9/2014) AT&T & Verizon DAS(Distributed
Antenna System) Projects nationwide. · Perform
Commissioning ,Integration and troubleshooting of Ericsson
6601,3206,3418,6201,6202 · Supervise civil and telecomm works
installation of DAS head end equipment such as UMTS cabinets, LTE
, RRUs, SIAD, Telco racks, cable trays, ladder racks, power plant , RF
jumpers, ground, LAN and optical cables. · Supervise contractors in the installation
of DAS(Distributed Antenna System )antenna, splitters , combiners and remote
units- MA1X,MA2X, HX. · Integration and testing of Cisco SIAD,
ME3400, Dantel, etc. · Conducts site walks/ survey with the
customer for a new BTS/DAS system installation. · Provides technical support to other
engineers with regards to integration and installation. · Field Coordination Microwave
Pathing Engineer
– Clearwire
Microwave Network Upgrade(Charlotte, NC) . . ·
Perform Microwave Path Alignment, Commissioning, Firmware
upgrades of Dragonwave Ceragon and Motorola Indoor units. Work
also includes DC power termination, Ethernet cabling,
grounding and Site Boss installation. ·
Perform pre-commissioning checklist & path audit of
new links before bringing the link on air ·
Perform microwave troubleshooting. Work with Clearwire Commissioning
Group during Link Network Integration Lead
Engineer
–
TMobile Orlando/Tampa Project ·
Flexi BTS Upgrade and PWE 7705
Router install in Orlando and Tampa Market. ·
Perform Nokia Flexi BTS
Installation and commissioning such as FSME, ESMB,FSMB, LTE,FRIE, FRIA
etc. 12/2002 – 8/2003
MCN Philippines Inc. (Mycom International) BTS Installation
and Commissioning Supervisor Makati City,
Philippines ·
Supervise contractors in the
installation, commissioning and integration of Nokia Ultrasite BTS. ·
Attended extensive GSM Course in
Florida, USA under Mycom North America 3/2000
– 01/2003 KEPPEL Communications Philippines Inc. Sr.
Project Engineer Telecom
Implementation In-Charge of National Capital Region(NCR) for Keppel -
Nokia Phase 7 and 8a project for Globe Telecom (Intratalk,
Ultrasite,Metrosite and Flexihopper) Makati
City, Philippines ·
Supervise the installation of
Nokia Base Transceiver Station equipments such as Ultrasite and DE/DF 34
Intratalk, Nokia Flexihopper, DMR 18 and Harris microwave radios, antenna,
feeder layout and power supplies (Ascom and Empower). ·
Perform Commissioning, Testing and
Integration of Nokia Ultra site and DE/DF 34 Intratalk BTS Equipments, Flexi
hopper and Harris microwave radios and power supplies. ·
Conducts BER Testing
for Harris Microstar 7G radios and acceptance test procedures. ·
Conducts Line of Site Survey (LOS)
and Technical Site Survey using binoculars, GPS, Compass, balloons and
digital camera. ·
Perform troubleshooting of
microwave radios (Nokia Flexihopper and Harris), BTS equipments, power
supplies and feeder cables. 08/1999
– 03/2000 QCOM(Quality Communications) Philippines, Inc. Sr.
Switching & Maintenance Engineer IT
& Technical Services Dept Makati
City, Philippines ·
In charge in the installation and
maintenance of analog & digital telephone lines, ACD and computers. ·
Handling and monitoring of
Nortel’s Meridian 1 Option 61C PABX, Main Distribution Frame, E1 and trunk
lines. ·
In charge with the installation
and maintenance of LAN, WAN, Hubs, Switch’s, Modems, Remote Access System,
servers and other data communications equipments. ·
Conducts regular preventive
maintenance on 20 KVA Liebert UPS and 375 KVA Perkins Genset. ·
Provides technical support to
external clients such as software upgrade and link related problems 10/1997
– 07/1999 Multimedia Telephony, Inc., Sr.
Transmission Staff Engineer Transmission-Radio
System Dept Makati
City, Philippines ·
Monitoring and troubleshooting of
all Radio Base Station for possible service interrupting alarms. ·
Installation and testing of
possible Radio Base Station. ·
Performing propagation test for
signal analysis. ·
Performing periodic maintenance
and other related works. Sr. Satellite TV
Sysytems Engineer/Technician 111 07/1992
– 08/1997 Rovitron Enterprises, Inc., Makati
City, Philippines ·
Supervise the installation of
Satellite-Receiving Antenna; Tracking, Peaking and Programming different
satellite receivers and decoders for video and audio reception (TVRO). ·
Designs and installation of Master
Antenna Television (MATV), Closed Circuit Television (CCTV), and Community
Antenna Television (CATV). ·
Supervise cabling (coaxial),
internal, underground and aerial. ·
Troubleshooting of different
satellite and CATV head-end equipment. ·
Perform project site inspection Certifications
and Licenses: ·
Corning
Optical Communications Wireless Commissioning(Mobile Access) – Certified
06/12/2014 – 06/12/2016 ·
Ceragon IP 10
Microwave Radio , Ceragon 1500P Microwave Radio ·
Dragon Wave
Microwave Radio ·
Harris
Microstar 7G Microwave Radio ·
Nokia
Flexihopper and Nokia DMR 18-38G Microwave Radios ·
Nokia Flexi
UMTS Certified Level 2 (with PTID) ·
Nokia BTS
Ultrasite Integrator certified Level 3 ·
Hauwei GSM
BTS Certified ·
Philippine
ECE Professional License ·
First Aid and
CPR ·
OSHA Cetified Trainings: ·
Mobile Access
Commissioning Course and Certification, Anaheim,CA USA, June 10 – June
13, 2014. ·
Mobile Access
Commissioning Course / Mobile Access RF Design Course,Virginia,USA, July 12th – July 15th, 2011 ·
Ceragon IP 10
Microwave Radios. November 24th and 25th, 2009,Orlando, FL ·
Dragon Wave
Microwave Radios. November 9th and 10th, 2009,Orlando, FL. ·
Ericsson
3206/3106 Node B(UMTS) and RBS(GSM) In house On the Job Training.
Mycom LA Project. Oct. 27 to 31, 2008. -Orientation and hands on training on
UMTS(Node B) commissioning and integration as well as step by step
procedure of upgrading software from P5 to P6 . -Orientation on doing Carrier
Add and T1 add, -RBS(GSM) commissioning and doing
sector add / reconfiguration ·
Alvarion
WiMax - Installation and Commissioning BreezeMAX(Orlando, Fl). Jan. 17 to 18,
2008. ·
Ceragon
FibeAir 1500P Microwave Radios. Oct. 30 to 31, 2007. ·
Nokia
Flexi UMTS Boot Camp(Conyers , Georgia,USA). Dec. 17 to 21, 2007 ·
Flexi
Pre-Requisite / UMTS Fundamentals (NOKIA, Georgia, USA) Oct. 16 - 20, 2006 ·
FLEXMASTER
carrier access course Nokia , Lake Mary , Florida office , 2006 ·
ROSENBERGER
cable connectors installation Mycom North America office Orlando, Florida ,
2006 ·
HUAWEI BSS
GSM Installation Course Shenzhen, China June 24, 2002 to July 12, 2002 ·
HUAWEI BTS
GSM On the Job Training (DPC Phase 3.1 project ) Lopburi,Thailand July
24 to August 14, 2002 ·
HARRIS
MicroStar M/H Operation & Maintenance Course Makati City,
Philippines March 18, 2002 ·
NOKIA
ULTRASITE BTS Installation Course NOKIA Office, Makati City, Philippines
February 16 – 21, 2001 ·
BTSCOM_34
Course NOKIA Office, Makati City, Philippines March 13-17, 2000 ·
NOKIA Digital
Microwave Radio DMR 18-38G Transmission Course NOKIA Office, Makati City,
Philippines March 1 & 2, 2000 Test
Equipment: ·
Praxim CW
Signal Generator ·
Spectrum
Analyzer ·
Anritsu Site
Master ·
Nokia Service
Terminal ·
HP Frequency
Counter ·
Fluke
Multi-meter ·
Bird
Wattmeter ·
LAN cable
tester ·
T Bird BER
tester ·
Fiber tester Skills: ·
Computer
literate (MS Word,MS Excel, MS Powerpoint, Visio) ·
Basic
computer troubleshooting ·
Can drive
motor vehicles ·
Site Surveys ·
Nokia 3G and
4G/LTE equipment(Commissioning & Integration) ·
Ericsson
3G/4G/LTE equipment(Commissioning & Integration) ·
Microwave
radios ·
Field
coordination ·
Distributed
Antenna System(Mobile Access) Education: 03/1991 University
of the East Bachelor of Science
major in Electronics and Communications Engineering (BSECE) Caloocan City,
Metro Manila, Philippines |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|